The lack of a fifth gear limited the high-end capacity of all Primula models.
2.
UK . ) The years 2009-2013 saw a boom in installed photovoltaic nameplate capacity, increasing nearly 15-fold, and 2013's year-end capacity of 17, 928 MW ranked third in the world, ahead of the United States at that time.
3.
This approach allows TCP Wave to overcome the ACK-clocked window-based transmission followed by other TCP variants . in fact, decoupling of the packet transmission from the experienced RTT, allows TCP Wave sender to have a proactive rate control with a fast tracking into the available end-to-end capacity.